File #: O-316-18    Version: 1 Name:
Type: Ordinance Status: Agenda Ready
File created: 8/2/2018 In control: Public Utilities Department
On agenda: 8/14/2018 Final action: 8/14/2018
Title: Authorizing the appropriation and expenditure of bond proceeds from the Water Bond Improvement Fund, in an amount not to exceed $9,000,000; authorizing the mayor to accept bids and to execute the necessary contract(s), after due advertising according to law, for the design, preparation of plans and specifications, engineering, bidding, construction oversight, testing, permits, renovation, construction, appurtenances, and other related work, tasks, equipment, and materials needed for the successful implementation of the Filter and Pipe Gallery Improvements at the Collins Park Water Treatment Facility; and declaring an emergency.

Label
DPU081418FILTERANDPIPEGALLERYIMPROVEMENTS
DPU/Water Treatment
W. Henry(x1840)
Revised

Title
Authorizing the appropriation and expenditure of bond proceeds from the Water Bond Improvement Fund, in an amount not to exceed $9,000,000; authorizing the mayor to accept bids and to execute the necessary contract(s), after due advertising according to law, for the design, preparation of plans and specifications, engineering, bidding, construction oversight, testing, permits, renovation, construction, appurtenances, and other related work, tasks, equipment, and materials needed for the successful implementation of the Filter and Pipe Gallery Improvements at the Collins Park Water Treatment Facility; and declaring an emergency.

Body
SUMMARY & BACKGROUND:
The Collins Park Water Treatment Plant was originally constructed as an 80 million gallons per day plant in 1942 with a 40 million gallons per day expansion in 1956. The filter and pipe gallery systems of the plant have remained largely unchanged. This project will upgrade the existing filters to state of the art biologically active treatment technology, install air scour equipment as a part of the filter backwash system, and refurbish or replace existing piping, valves and valve operators that have reached the end of their service life. Funding for this project is available in the current CIP from the Water Bond Improvement Fund (2018 Bond Issuance) for the Filter and Pipe Gallery Improvement project.

Summary
NOW, THEREFORE, Be it ordained by the Council of the City of Toledo:

SECTION 1. That an amount not to exceed $9,000,000 is appropriated from the bond proceeds in the Water Bond Improvement Fund in Account Code 6062-32000-4UB1718STDSTD; and further authorizing the expenditure of same for the Filter and Pipe Gallery Improvements at the Collins Park Water Treatment Facility.

SECTION 2. That the mayor is authorized to accept bids and to execute the necessary contracts for ...