File #: O-098-24    Version: 1 Name:
Type: Report Status: Agenda Ready
File created: 2/13/2024 In control: Public Service Department
On agenda: 3/13/2024 Final action: 3/13/2024
Title: Authorizing the expenditure of $710,000 from the unappropriated balance of the Capital Improvement Fund for Hoffman Road Landfill Gas Collection and Control System (GCCS) improvements and landfill development activities; authorizing the Mayor to prepare plans and specifications, accept bids and award contracts for professional, engineering and construction activities for landfill GCCS improvements, development and related construction activities; and declaring an emergency.

Label
Landfill Improvements - CIP $710,000
Public Service / Solid Waste
Megan Robson (936-2306) Ryan Murphy (x2640)
Revised

Title
Authorizing the expenditure of $710,000 from the unappropriated balance of the Capital Improvement Fund for Hoffman Road Landfill Gas Collection and Control System (GCCS) improvements and landfill development activities; authorizing the Mayor to prepare plans and specifications, accept bids and award contracts for professional, engineering and construction activities for landfill GCCS improvements, development and related construction activities; and declaring an emergency.


Body
SUMMARY & BACKGROUND:

This Ordinance authorizes the expenditure of funds from the Capital Improvement (CIP) Fund for Gas Collection and Control System (GCCS) improvements and other necessary landfill development and construction activities at the Hoffman Road Landfill (landfill). These activities are needed to ensure compliance with relevant landfill permits, enhance effective operation and to comply with applicable regulations under Ohio Administrative Code (OAC) 3745-27 and relevant federal regulations. Furthermore, these activities support the city's sustainability goals by reducing the emissions of Greenhouse gases to the environment.

The 2024 landfill CIP program a combination of permitting, engineering and construction activities are needed. These include, but may not be limited to: 1) environmental consulting and engineering, 2) Construction Quality Assurance (CQA) and reporting, 3) upgrading the GCCS to replace wells and aging components 4) Replace components of the leachate management system, including a wet well, pumps, panels, piping and flow metering equipment,5) landfill surface grading, soil cover and seeding, 6) installing semi-permanent & permanent stormwater management features, 7) portable and permanent litter control measures, and 8) infrastructure improvements including roadways and ditches.

Summary
NOW THEREFORE Be it or...