File #: O-291-22    Version: 1 Name:
Type: Ordinance Status: Approved
File created: 5/19/2022 In control: Transportation Department
On agenda: 6/7/2022 Final action: 6/7/2022
Title: Authorizing the mayor to enter into cooperative grant agreements with and accept financial assistance from the State of Ohio Department of Transportation (ODOT) for numerous construction projects; authorizing the acceptance, deposit, appropriation and expenditure of grant proceeds into the Capital Improvement Fund in an amount not to exceed $5,220,220; authorizing the mayor to execute all necessary documentation for the grants; authorizing the mayor to accept bids and award contracts related to the construction; and declaring an emergency.
Label
TDOT060722ODOTGRANTS
Engineering and Construction Management
Timothy Grosjean (x1344)
Revised

Title
Authorizing the mayor to enter into cooperative grant agreements with and accept financial assistance from the State of Ohio Department of Transportation (ODOT) for numerous construction projects; authorizing the acceptance, deposit, appropriation and expenditure of grant proceeds into the Capital Improvement Fund in an amount not to exceed $5,220,220; authorizing the mayor to execute all necessary documentation for the grants; authorizing the mayor to accept bids and award contracts related to the construction; and declaring an emergency.

Body
SUMMARY & BACKGROUND:
The Division of Engineering and Construction Management has been working closely with ODOT to secure grant funding through multiple funding programs for several projects. All amounts are grant dollars and are assigned to specific projects as follows:

A maximum of $1,611,440 has been allocated by ODOT through TMACOG for a reconstruction project; Collingwood Boulevard from Central Avenue to Hackett Road. Matching funds will be provided through the Division of Engineering and Construction Management Matches and Planning budget and the Ohio Public Works Commission (OPWC). Construction for this project is scheduled for 2024.

A maximum of $1,223,460 has been allocated by ODOT through TMACOG for a resurfacing project; Manhattan Boulevard from Stickney Avenue to Wallace Boulevard. Matching funds will be provided through the Division of Engineering and Construction Management Matches and Planning budget and OPWC. Construction for this project is scheduled for 2024.

A maximum of $1,642,320 has been allocated by ODOT through TMACOG for a resurfacing project; Tremainsville Road from Laskey Road to Alexis Road. Matching funds will be provided through the Division of Engineering and Construction Management Matches and Planning budget. Construction for this project is scheduled for 2024.

A maximum of ...

Click here for full text