File #: O-518-23    Version: 1 Name:
Type: Ordinance Status: Approved
File created: 9/11/2023 In control: Public Utilities Department
On agenda: 9/26/2023 Final action: 9/26/2023
Title: Authorizing the appropriation of $48,998 from the unappropriated balance of the 2012 Bond issuance, $1,133,904 from the unappropriated balance of the 2013 Bond issuance, $285,245 from the unappropriated balance of the 2016 Bond issuance and $1,079,899 from the unappropriated balance of the 2018 Bond issuance; authorizing the expenditure of $2,548,046 from the Water Bond Improvement Fund for the Chemical Feed Improvements Project at the Division of Water Treatment; authorizing the Mayor to execute the necessary contract(s) for the design, preparation of plans and specifications, engineering, bidding, construction oversight, testing, permits, renovation, construction, appurtenances, and other related work, tasks, equipment, and materials needed; and declaring an emergency.
Attachments: 1. Video: City Council 9/26/2023
Label
DPU092623CHEMICALFEEDIMPROVEMENTS
Water Treatment
J. Goetz (x2399)
Revised

Title
Authorizing the appropriation of $48,998 from the unappropriated balance of the 2012 Bond issuance, $1,133,904 from the unappropriated balance of the 2013 Bond issuance, $285,245 from the unappropriated balance of the 2016 Bond issuance and $1,079,899 from the unappropriated balance of the 2018 Bond issuance; authorizing the expenditure of $2,548,046 from the Water Bond Improvement Fund for the Chemical Feed Improvements Project at the Division of Water Treatment; authorizing the Mayor to execute the necessary contract(s) for the design, preparation of plans and specifications, engineering, bidding, construction oversight, testing, permits, renovation, construction, appurtenances, and other related work, tasks, equipment, and materials needed; and declaring an emergency.

Body
SUMMARY & BACKGROUND:
As a part of the recent CIP Improvements at the Collins Park Water Treatment Plant and associated pump stations, a number of improvements have been made. However, several systems have yet to be upgraded and refurbished including the permanganate feed line replacement at the Low Service Pump Station as well as the alum storage and feeding facilities at the Collins Park Water Treatment Plant. The proposed appropriated monies are available from a number of projects that are a part of the CIP program that will be successfully completed for less than the original project estimates, including the Disinfection Facility, the Ozone Treatment Facility, the Intake Crib Improvements and the Basins 1-4 Improvements. This proposed work will complete the refurbishments and improvements to the chemical systems at Collins Park and the associated pumping stations.

Summary
NOW, THEREFORE, Be it ordained by the Council of the City of Toledo:

SECTION 1. That the appropriation of $48,998 is authorized from the Water Bond Improvement Fund to Account Code 6062-32000-4UB5612STDSTD (Chemical Fe...