File #: REF2622    Version: 1 Name:
Type: Referral Status: Answered Referral
File created: 1/27/2026 In control: Clerk's Office
On agenda: 1/27/2026 Final action: 1/30/2026
Title: From: Councilwoman Morris Response Requested: 2/2/2026 What are the parameters/summary of work Edison will be conducting while using Detwiler for a staging area?
Sponsors: Theresa Morris
Date Ver.Action ByActionResultAction DetailsAgenda SummaryAudio
No records to display.

Label

Councilwoman Morris                     

Agenda Review

Lease with Edison

1/27/2026

 

Title

From:   Councilwoman Morris                       Response Requested:                      2/2/2026

 

What are the parameters/summary of work Edison will be conducting while using Detwiler for a staging area?

 

 

 

Body

Referral Response:

TO: Councilwoamn Morris

THROUGH: Abby Arnold, Deputy Mayor

FROM: Joe Fausnaugh, Director Public Services

 

Please find the information below regarding the purpose of the proposed temporary Edison storage yard at Detwiler Park. Edison will aim to ensure that the fencing is opaque. The project involves replacing the existing structures on Ironville Lapier to enhance reliability due to the area's growth.

1. Typical Items Stored On-Site but not limited to the list below.

A. Materials

•                     Concrete components (precast foundations, anchor blocks)

•                     Steel structure components (poles, lattice towers, arms, crossarms)

•                     Concrete components (precast foundations, anchor blocks)

•                     Hardware & fittings (bolts, insulators, dampers, spacers, guy wire)

•                     Conductor wire (spools of ACSR or similar)

•                     Shield wire/OPGW (optical ground wire reels)

•                     Grounding materials (ground rods, connectors)

•                     Anchor assemblies (screw anchors, guy anchors)

B. Equipment

•                     Construction machinery (cranes, diggers, bucket trucks, skid steers)

•                     Line pulling & tensioning equipment

•                     Material trailers

•                     Small tools (torque wrenches, hydraulic presses, drills)

•                     Safety gear (PPE stock, traffic control devices, barricades)

C. Temporary Facilities

•                     Jobsite trailers (office, storage, crew break areas)

•                     Portable restrooms

•                     First-aid kits / safety stations

 

 

 

2. Types of Security

 

A. Physical Security

•                     Fencing

o                     Temporary chain-link or panel fencing around laydown yards

o                     Lockable gates for access control

•                     Locked storage containers

o                     Shipping containers or Conex boxes for small/high-value items