Label
DPU031020CONSENTLEGISLATIONMETROPARKSBYRNEROAD
Engineering Services
Timothy Grosjean (x1344)
(Revised)
Title
Authorizing the mayor to enter into and execute cooperative agreements between the City of Toledo and the Metropolitan Park District of the Toledo Area and to give consent to the Metropolitan Park District of the Toledo Area for construction of a bike path on Byrne Road from the bridge over Swan Creek to Arlington Avenue within the city limits; and declaring an emergency.
Body
SUMMARY & BACKGROUND:
The Metropolitan Park District of the Toledo Area (Toledo Metroparks) will be constructing a bike path within Swan Creek Park that ends at the city right of way at Byrne Road. This is part of the Swan Creek Trail that is in the City's adopted 2015 Bike Plan. The trail is supposed to continue and connect to the already constructed portion along Arlington Avenue. The connection piece between the two sections would be an approximately 500' bike path along Byrne Road. The city has worked with the Metroparks to have them include in their plans the design and construction of the Byrne Road section that is within the City of Toledo Limits. This project is scheduled to construct in 2020.
The Metropolitan Park District of the Toledo Area will administer the design and construction of the project with Metroparks' funding and is paying for 100% of the construction outside of the city limits. The City of Toledo will participate in the costs by paying for 100% of the portion that is within the city limits, to be paid for with Matches and Planning funds.
The fiscal impact of this ordinance is as follows:
- The amount of funds requested: none
- The expenditure budget line item: none
- New revenue generated (operational revenue, grants, if any): none
- Revenue budget line item (if any): none
- Are funds budgeted in the current fiscal year (yes/no)?: n/a
- Is this a capital project (yes/no)? n/a
- If yes, is it new or existing (new/existing)? n/a
- What section of t...
Click here for full text