Residential road program with the passage of the increase, has raised about 100 million dollars. Provide a composite of the roads proposed to be done, Those completed, total mileage done, type of road and total budgeted for the residential program and total expenditures.
Body
Referral Response:
Below is what has been accomplished in the last 3 years as well as what is planned for this year. As a reminder this only represents the residential roadway program, our major roads program (Matches and Planning), overlay and patch and seal programs are in addition to these numbers.
# of proposed roads vs completed roads
2021 - 109 proposed, 113 completed
2022 - 118 proposed, 122 completed
2023 - 105 proposed, 105 completed
2024 - 96 proposed
Treatment Types
2021 - 15 reconstructions, 4 reclamations, 94 resurfacings
2022 - 24 Reconstructions, 98 resurfacings
2023 - 18 Reconstructions, 10 reclamations, 77 resurfacings
2024 - 24 reconstructions, 13 reclamations, 59 resurfacings (Planned)
Lane Miles
2021 - 44.18 Lane Miles
2022 - 51.37 Lane Miles
2023 - 43.87 Lane Miles
2024 - 41.89 Lane Miles (Planned)
Below is the link to the 2024 program. Each year this link is populated with a list and a map of all projects.
<https://toledo.oh.gov/residents/neighborhoods/transportation-traffic/road-construction>
I have also attached a list of the 2021-2023 roads (note this list includes all programs, not just the residential roads).
Thank you,
Abby M. Arnold, MPA
Deputy Mayor
Office of the Mayor