Label
DPW05262026 RAWWATERMAINPROJECTREALESTATEACQUISITION2
Water Treatment
A McClure (x7866)
Revised
Title
Authorizing the reappropriation of $183,806 in the Water Bond Fund for real estate acquisition and associated costs for the Raw Water Main Project; authorizing the expenditure of same; authorizing the Mayor to accept bids for services and execute agreements as necessary and appropriate for real estate acquisition and associated cost for the Raw Water Main Project; and declaring an emergency.
Body
SUMMARY & BACKGROUND:
The Basin 8 Flocculation and Sedimentation Basin Project is now completed for less than the original budget and eligible for closing and disappropriation. The City of Toledo has previously engaged in the design of a replacement Raw Water Main to update one of the existing aging raw water mains that was installed in 1940 and is reaching the end of its useful life. The replacement of the raw water main is critical to ensure a continued reliable water supply to the Toledo region. The new raw water main is designed to be installed parallel to the existing mains, allowing construction to proceed without interrupting continuous water service. This will require the acquisition of additional real property, additional temporary and permanent easements, updates to existing easements and compensation to restore property and crop loss along the nine (9) mile route of the Raw Water Main.
Summary
NOW THEREFORE Be it ordained by the Council of the City of Toledo:
SECTION 1. That the disappropriation of $183,806 is authorized from the Water Bond Improvement Fund Account Code 6062-32000-4UB1916STDSTD Basin 8 Flocculation and Sedimentation Basin Project.
SECTION 2. That the appropriation of $183,806 is authorized from the Water Bond Improvement Fund to Account Code 6062-32000-4UB1826STDSTD and the expenditure of an amount not to exceed $183,806 is authorized for real estate acquisition and other associated cost for the Raw Water Main Project.
...