Title: Repealing Ordinance 433-25 in its entirety; amending Sections 1 and 2 of Ordinance 370-26 for the purpose of expanding the final settling tank drive replacement project at the Water Reclamation Facility; authorizing the Mayor to amend existing agreements with, or enter into necessary agreements with, the United States Environmental Protection Agency (USEPA); authorizing the acceptance, deposit, appropriation and expenditure of grant proceeds in an amount not to exceed $880,000 in the Sewer Replacement Fund for said project; authorizing the Mayor to accept bids and award contracts for proprietary parts and equipment and related professional, engineering, installation, testing and commissioning services; and declaring an emergency.
Date Ver.Action ByActionResultAction DetailsAgenda SummaryAudio
No records to display.


Label
DPU120126EPAFINALSETTLINGTANKDRIVEGRANT
Water Reclamation
Andy McClure (x7866)
Revised

Title
Repealing Ordinance 433-25 in its entirety; amending Sections 1 and 2 of Ordinance 370-26 for the purpose of expanding the final settling tank drive replacement project at the Water Reclamation Facility; authorizing the Mayor to amend existing agreements with, or enter into necessary agreements with, the United States Environmental Protection Agency (USEPA); authorizing the acceptance, deposit, appropriation and expenditure of grant proceeds in an amount not to exceed $880,000 in the Sewer Replacement Fund for said project; authorizing the Mayor to accept bids and award contracts for proprietary parts and equipment and related professional, engineering, installation, testing and commissioning services; and declaring an emergency.

Body
SUMMARY & BACKGROUND:
Ordinance 433-25 authorized an EPA grant in an amount not to exceed $880,000 for the belt filter press and related equipment project. The belt filter press project does not satisfy applicable Build America Buy America (BABA) requirements. The Division of Water Reclamation proposes to seek EPA approval to apply the existing grant allocation to an alternative eligible capital project at the Water Reclamation Facility, including any required amendment to the EPA grant agreement or project purpose. Ordinance 370-26 authorized $275,000 from the Sewer Replacement Fund for replacement of the failed final settling tank No. 2 drive assembly. The Water Reclamation Facility operates twelve final settling tanks, also known as final clarifiers, which separate settleable solids from treated wastewater prior to discharge. Drive-powered sludge collectors remove settled solids and support compliance with the Ohio EPA National Pollutant Discharge Elimination System (NPDES) permit. The existing drive assemblies are of similar age and condition. To preserve the federal grant opportunity and reduce the risk of additional drive ...