Authorizing the disappropriation of $151,208.95 from the Water Bond Improvement Fund; authorizing the appropriation and expenditure of $151,208.95 in the Water Bond Improvement Fund for the Pump, Motor, Large Valve, Repair/Rebuild/Replacement Project at the Collins Park Water Treatment Plant; authorizing the Mayor to execute the necessary contract(s) for the design, preparation of plans and specifications, engineering, bidding, construction oversight, testing, permits, renovation, construction, appurtenances, and other related work, tasks, equipment, and materials needed; and declaring an emergency.
Body
SUMMARY & BACKGROUND:
Ordinance 220-13 previously authorized funding for the Pump, Motor, Large Valve, Repair/Rebuild/Replacement project for the Collins Park Water Treatment Plant. This project is to address the concerns of the Ohio EPA of the deteriorating condition of major equipment at the treatment plant and the need for improvements to maintain a reliable regional water system. To provide additional funds to complete improvements at the High Service Pump Station, this ordinance authorizes reappropriating monies remaining from completed projects funded from the Series 2013 Bond Issuance.
Summary
NOW, THEREFORE, Be it ordained by the Council of the City of Toledo:
SECTION 1. That the following projects in the Water Bond Improvement Fund are reduced of encumbrances, disappropriated and closed:
Fund |
Cost Center |
Functional Area |
Project Name |
Amount |
6062 |
32000 |
4UB0913STDSTD |
Heatherdowns Pump Improvements |
$65,107.90 |
6062 |
32000 |
4UB1513STDSTD |
Filter and Pipe Gallery Improvements |
$50,730.88 |
6062 |
32000 |
4UB1813STDSTD |
Alum Storage |
$327.00 |
6062 |
32000 |
4UB1913STDSTD |
Lagoon Improvements |
$35,043.17 |
SECTION 2. That an amount not to exceed $151,208.95 is appropriated from the bond proceeds in the Water Bond Improvement Fund in account code 6062-32000-4UB2113STDSTD (Pump, Motor, Large Valve, Repair/Rebuild/Replacement); and authorizing expenditure of same.
SECTION 3. That the mayor is authorized to execute necessary contract(s) for construction, testing, permits, and other related work, tasks, equipment and materials needed for the Pump, Motor, Large Valve, Repair/Rebuild/Replacement project upon such terms and conditions shall be approved by the Director of Public Utilities and Director of Law.
SECTION 4. That the finance director is authorized to issue his warrant or warrants against the account code identified in Section 2 in an amount not to exceed $151,208.95 in payment of the obligations incurred pursuant to the contract(s) authorized in Section 3 upon presentation of the proper voucher or vouchers.
SECTION 5. That the disappropriation of any remaining budget to fund balance is authorized at project closeout.
SECTION 6. That this ordinance is declared to be an emergency measure and shall be in force and effect from and after its passage. The reason for the emergency lies in the fact that this ordinance is necessary for the immediate preservation of the public peace, health, safety and property, and for the further reason that this ordinance must be immediately effective in order to ensure the uninterrupted distribution of quality potable drinking water to the citizens of the entire region.
Vote on emergency clause: yeas _____, nays _____.
Passed: _________________, as an emergency measure: yeas _____, nays _____.
Attest: ________________________ __________________________________
Clerk of Council President of Council
Approved: _____________________ __________________________________
Mayor
I hereby certify that the above is a true and correct copy of an Ordinance passed by Council ________________________.
Attest: ________________________
Clerk of Council