Legislation Details

File #: REF-053-25    Version: 1 Name:
Type: Referral Status: Answered Referral
File created: 6/12/2025 In control: Clerk's Office
On agenda: 6/11/2025 Final action: 12/31/2025
Title: From: Councilwoman Gadus Response Requested: ASAP What are the requirements for materials used in driveway & sidewalks by contractors? Do quality control auditors check the scope of work and competed jobs by contractors doing sidewalks & driveways? Is there a system in place to check satisfaction of work completed by contractors, for residents?
Date Ver.Action ByActionResultAction DetailsAgenda SummaryAudio
No records to display.

Label

Councilwoman Gadus

Mobility, Sustainability & Beautification Committee

Sidewalk Rehabilitation Program Pilot

6/11/2025

 

Title

From:   Councilwoman Gadus                      Response Requested:                      ASAP

 

What are the requirements for materials used in driveway & sidewalks by contractors?

 

Do quality control auditors check the scope of work and competed jobs by contractors doing sidewalks & driveways?

 

Is there a system in place to check satisfaction of work completed by contractors, for residents?

 

 

Body

Referral Response:

TO:                                                               Toledo City Council

THROUGH:                                          Abby Arnold, Deputy Mayor

FROM:                                          Megan Robson, Public Service Director

 

 

All requirements can be found in the 2025 Construction Standards found here: <https://cdn.toledo.oh.gov/uploads/documents/Transportation/Engineering/2025-Construction-Standards.pdf>

 

When permits are issued, we provide residents with a direct point of contact to our Construction Contract Specialist within Engineering Services.  Additionally, we have construction monitors who inspect the right-of-way work performed by the contractors.